BID/RFQ/RFP INFORMATION

Basic Low Voltage Work

Addendums: Bid No. 2012-13 (P11) Basic Low Voltage Work

  • Addendum 1 Basic Low Voltage 2012-13 (P11) (.pdf)
  • Addendum 1 D - BID FORM FOR LOW VOLTAGE  (.pdf)
  • Addendum 2 Basic Low Voltage 2012-13 (P11) (.pdf)
     

Bid No. 2012-13(P11)

  • Notice Inviting Bids (.pdf)
  • Bid Cover (.pdf)
  • Bid Bond (.pdf)
  • Instruction to Bidders (.pdf)
  • Bid Form (.pdf)
  • Designation of Subcontractors (.pdf)
  • Non-Collusion Affidavit (.pdf)
  • Site-Visit Certification (.pdf)
  • Prevailing Wage & Related Labor Requirements Cert. (.pdf)
  • Civil Lit. History/Civil Litigation Certification (.pdf)
  • Criminal Convictions/Criminal Conv. Cert. (.pdf)
  • False Claims/False Claims Act Violation (.pdf)
  • Contract Service Agreement (.pdf)
  • Performance Bond (.pdf)
  • Labor and Materials Bond (.pdf)
  • General Conditions (.pdf)
  • Hazardous Materials Certification (.pdf)
  • Workers' Compensation Certification (.pdf)
  • Hazardous Materials Procedures & Requirements (.pdf)
  • Notice Re: Criminal Records Check (.pdf)
  • Criminal Records Check Certification (.pdf)
  • Drug-Free Workplace Certification (.pdf)
  • Disabled Veteran Business Enteprise Certification (.pdf)
  • Phasing of the Work (.pdf)
  • Specifications & Scope of Work (.pdf)
  • Section 1 (.pdf)
  • Section 2 (.pdf)
  • Section 3 (.pdf)
  • SignInSheet -Job Walk (.pdf)
  • Business Cards-Job Walk (.pdf)
  • Directions to Bid Opening: (.jpg)

General Contracting Service Project

Addendums: Bid No. 2012-13 (P10) - Cover Page -GC Relocation Project (.pdf)

  • Addendum 1 Arroyo High School - Specifications  (.pdf)
  • Addendum 1 Arroyo High School - Drawings (.pdf)
  • Addendum 1 Granada Child Care Center - Specifications  (.pdf)
  • Addendum 1 Granada Child Care Center - Drawings (.pdf)
     

Specifications

  • Granada Child care center Relos-Drawings Part1 (.pdf)
  • Granada Child care center Relos-Drawings Part2 (.pdf)
  • Granada Child care center Relos-Specs  (.pdf)
  • Arroyo HS Relos-Drawings Part1 (.pdf)
  • Arroyo HS Relos-Drawings Part2 (.pdf)
  • Arroyo HS Relos-Specs (.pdf)

 

Bid No. 2012-13(P10)

  • Notice Inviting Bids (.pdf)
  • Bid Cover (.pdf)
  • Bid Bond (.pdf)
  • Instruction to Bidders (.pdf)
  • Bid Form (.pdf)
  • Designation of Subcontractors (.pdf)
  • Non-Collusion Affidavit (.pdf)
  • Site-Visit Certification (.pdf)
  • Prevailing Wage & Related Labor Requirements Cert. (.pdf)
  • Civil Lit. History/Civil Litigation Certification (.pdf)
  • Criminal Convictions/Criminal Conv. Cert. (.pdf)
  • False Claims/False Claims Act Violation (.pdf)
  • Contract Service Agreement (.pdf)
  • Performance Bond (.pdf)
  • Labor and Materials Bond (.pdf)
  • General Conditions (.pdf)
  • Hazardous Materials Certification (.pdf)
  • Workers' Compensation Certification (.pdf)
  • Hazardous Materials Procedures & Requirements (.pdf)
  • Notice Re: Criminal Records Check (.pdf)
  • Criminal Records Check Certification (.pdf)
  • Drug-Free Workplace Certification (.pdf)
  • Disabled Veteran Business Enterprise Certification (.pdf)
  • Phasing of the Work (.pdf)
  • Specifications & Scope of Work (.pdf)
  • Directions to Bid Opening (.jpg)
  • Sign-In Sheet (.pdf)
  • Business Cards Pg 1(.pdf)  Pg 2(.pdf)

Asbestos Abatement Project / Mountain View High School

Bid No. 2012-13 (P9) 

  • Bid Submission Deadline - Addendum 1 (.pdf)
  • EMUHSD MVHS SAMPLING Report (.pdf)
  • Mountain View HS Re-inspection Report (.pdf)
  • Job Walk Sign-In Sheets (.pdf)

 

 

 

 

 

 

Notice of Sale or Exchange of Real Property or Suprlus Equipment

  • No postings at this time